BB3 Pumps for US Air Force
Project Summary
CAI was awarded the contract to design and fabricate three units of horizontal axially split, multistage, between bearings pump/driver assemblies (BB3 Pumps) from the U.S. Air Force. The pumps are installed at Arnold Air Force Base in Tennessee.
The pump assemblies are an industrial system that will be used to drive an intermittent closed loop demineralized water cooling system at the air base.
CAI is a U.S. Government certified contractor and won this project through an open solicitation process.
Services Provided
- Design
- Manufacturing
- Testing
- Packaging and shipping